Billions of dollars over budget. Years behind schedule. Thousands of changes along the way. For government agencies responsible for massive infrastructure projects, these outcomes aren’t simply embarrassing headlines – they can mean wasted taxpayer dollars, disrupted timelines, and years of additional work. While no single issue is responsible for every troubled project, effective data management can play an important role in keeping increasingly complex projects coordinated, reducing unnecessary rework, and preventing costly mistakes.
The California High-Speed Rail project has become one of the most prominent examples of just how dramatically the cost and timeline of a major public infrastructure project can change. According to a local California news report, when voters approved funding in 2008, the entire 500-mile Los Angeles-to-San Francisco system was estimated to cost approximately $33 billion. By 2023, the estimated cost had risen as high as $128 billion, while the initial 171-mile segment alone was projected to cost as much as $35 billion.
Projects of this scale can experience delays and cost overruns for many reasons. But they also demonstrate how expensive design changes and rework can become. Better data sharing, version control, and continuity can help agencies establish a reliable source of project information and keep work moving forward.
These challenges will be the focus of an upcoming IMAGINiT Technologies webinar, “Modernize Government Project Delivery with Autodesk Forma,” which will explore how advanced data management tools designed for government projects can help federal agencies centralize project information, manage access across project teams, and maintain data continuity from planning through closeout and beyond.

Ahead of the webinar, we sat down with Brett Tully, Strategic Account Executive, Federal DOE, at IMAGINiT Technologies, to discuss the importance of taking control of government project data, the consequences when that information isn’t effectively managed, and how agencies can learn how to better manage their data so these challenges don’t occur in the future.
GovDesignHub (GDH): How many different organizations generate project data during the design and construction phase of a large public infrastructure project?
Brett Tully: There can be dozens, and sometimes hundreds, of organizations and individual stakeholders generating project data throughout the lifecycle of a large public infrastructure project. That can include the government owner or agency, program managers, architects, engineers, surveyors, contractors, subcontractors, specialty consultants, material suppliers, inspectors, commissioning teams, utility companies, and regulatory agencies.
And each organization may generate different types of information, such as CAD and BIM models, drawings, specifications, schedules, cost information, surveys, reality-capture data, inspection reports, RFIs, submittals, change orders, as-built documentation, equipment information, and more.
“The challenge isn’t simply storing all of that information. It’s being able to control it, find it, understand it, validate it, and ultimately use it.” –Brett Tully
More importantly, the data doesn’t come from one place or one organization. It’s being created and modified by a very large ecosystem of participants who are often using different systems, standards, processes, and technologies.
GDH: How does this large ecosystem of stakeholders and contractors impact a government agency’s ability to manage and control its project data?
Brett Tully: This makes data management significantly more difficult. While a government agency may be the owner of the project, it isn’t necessarily the creator of most of the data. Data is coming in from numerous organizations, each with its own software, processes, naming conventions, file formats, and standards.
Without a clearly defined data-management strategy, agencies can end up with multiple versions of the same information, disconnected systems, inconsistent standards, and uncertainty about which information is current and authoritative.
“The better the agency can control its information… and keep the project moving on schedule and within budget.” –Brett Tully
The challenge isn’t simply storing all of that information. It’s being able to control it, find it, understand it, validate it, and ultimately use it. That is why establishing standards and processes before the data starts flowing is so important. The agency needs to define how information will be created, organized, exchanged, reviewed, approved, maintained, and ultimately handed over.
GDH: What negative impacts could result if government agencies and their contractors don’t control and manage this data? How would this impact project timelines and budgets?
Brett Tully: Poor data management can create problems throughout the entire project. When teams are working from outdated or conflicting information, it can lead to rework, design conflicts, construction errors, delays, change orders, and additional costs.
For example, if a contractor is working from an outdated drawing or an engineering change isn’t communicated effectively to the appropriate teams, work may have to be redone. On a large infrastructure project, even relatively small problems can become extremely expensive when they affect multiple contractors or critical activities.
“Good data management creates a digital thread from planning and design through construction and into operations and maintenance.” –Brett Tully
Poor data management can also make it much harder to determine who has the latest information, what changed, when it changed, and who approved it. Ultimately, the data itself becomes a project risk. The better the agency can control its information, the better positioned it will be to reduce rework, improve coordination, identify issues earlier, and keep the project moving on schedule and within budget.
GDH: What impacts could this have after the project is turned over? Why is this data essential for ongoing maintenance and management of infrastructure?
Brett Tully: This is where the importance of project data extends well beyond construction. When a project is completed, the government agency doesn’t simply need a building, roadway, bridge, airport, or other piece of infrastructure; it needs to operate and maintain that asset for decades. The information generated during design and construction becomes the foundation for that ongoing management.
For example, facility managers may need information about equipment, materials, locations, warranties, maintenance requirements, systems, utilities, and asset history. If that information is incomplete, inaccurate, or difficult to access at turnover, the agency may spend years trying to reconstruct information that should have been delivered as part of the project.
“Ultimately, the goal is to help government agencies move from simply collecting project data to actually controlling and leveraging it throughout the entire lifecycle of their infrastructure.” –Brett Tully
Good data management creates a digital thread from planning and design through construction and into operations and maintenance. That means the agency can continue using the information it paid to create rather than treating project completion as the end of the data lifecycle.
GDH: You’re going to be a speaker at an upcoming Webinar on how governments can better control construction data during project lifecycles. Who should attend this Webinar, and what can they expect to learn?
Brett Tully: The webinar should be relevant to anyone responsible for delivering, managing, maintaining, or overseeing public infrastructure. That includes government agency executives and project managers, engineering and architecture teams, construction managers, contractors, BIM and CAD managers, facility and asset managers, IT and data-management professionals, and anyone responsible for establishing project standards or managing project information.
Attendees should come away with a better understanding of why construction data needs to be treated as a strategic asset, not simply as a collection of files. They’ll learn how to establish better standards and processes for managing information across the project lifecycle, how to improve collaboration between owners and contractors, how to reduce the risks associated with disconnected or inaccurate data, and how to make sure the information created during design and construction remains useful after the project is completed.
Ultimately, the goal is to help government agencies move from simply collecting project data to actually controlling and leveraging it throughout the entire lifecycle of their infrastructure.






